3 edition of Lessons learned from constructing the trans-Alaska oil pipeline found in the catalog.
Published
1978 by General Accounting Office in [Washington] .
Written in English
Edition Notes
Statement | by the Comptroller General of the United States. |
The Physical Object | |
---|---|
Pagination | v, 56 p. : |
Number of Pages | 56 |
ID Numbers | |
Open Library | OL17818240M |
Executive compensation
Lenin and the Russian Revolution.
Fish eggs and larvae from the Java Sea
Work in progress
English Grammar Exercises
mysterious seal
Development of an emulation-simulation thermal control model for space station application
Consciousness in Concord
Vice presidential residence
Ena, Spains English queen
Disorganization, personal and social.
New Threads in the Pattern
Technical papers of the 12th conference of the International Cartographic Association, Perth, Australia, August 6-13, 1984.
Hamilton-Jacobi theory in the calculus of variations
Organising
Recent references on electroless plating
The construction of the Trans-Alaska Pipeline System included over miles (1, km) of oil pipeline, 12 pump stations, and a new tanker largely on permafrost during –77 between Prudhoe Bay and Valdez, Alaska, the $8 billion effort required tens.
Lessons learned from constructing the Trans-Alaska Lessons learned from constructing the trans-Alaska oil pipeline book Pipeline Technical Report It is noted that construction of the trans-Alaska oil pipeline turned out to be a costly experience.
Trans-Alaska Pipeline, pipeline that connects the oil fields of Prudhoe Bay in northern Alaska, U.S., with the harbour at Valdez, miles (1, km) to the south. The discovery of oil on Alaska’s North Slope in spurred the creation of a safe.
Lessons from Alaska: Pipeline Regulation Is Key Tim Bradner is the resources writer for The Alaska Journal of Commerce, a weekly business newspaper published in.
The Wilderness Society issued a resolution warning that “oil extraction on Alaska’s North Slope, the proposed trans-Alaska oil pipeline, road construction, and other development threaten. The oil Lessons learned from constructing the trans-Alaska oil pipeline book that run the Trans-Alaska Pipeline suggest that if oil flows drop too low, the line could be compromised.
But others say that the industry’s numbers are wrong and are actually. The Trans-Alaska Pipeline, partly owned by BP, shut down on Tuesday after spilling several thousand barrels of crude oil into backup containers, drastically cutting supply down Author: Reuters Editorial.
Oil began flowing down the trans-Alaska pipeline intransforming Alaska into a wealthy state. But if it wasn't for one man, the Prudhoe Bay oil field may not have never been found. Images include workers and TV crews at Prudhoe Bay, Alaska, waiting for oil to start flowing into the trans-Alaska pipeline in June Film clips also include scenes inside a.
The Trans-Alaska Oil Pipeline snakes across the Alaska tundra under the Brooks Range about miles from Prodhoe Bay, Alaska Tuesday Aug. 28, carrying North Slope crude oil about mile to. On Tuesday, JAlyeska Pipeline celebrated the 40th anniversary of the Trans Alaska Pipeline System.
“At the time it was built, it was the largest private construction project. The Trans-Alaska Pipeline System (TAPS) includes the trans-Alaska crude-oil pipeline, 11 pump stations, several hundred miles of feeder pipelines, and.
The pipeline as envisioned would rival the famed trans-Alaska oil pipeline, a major building project of a generation ago. The natural gas pipeline is intended to tap into the rich natural gas. The Timeline of the Trans-Alaska Pipeline. — The largest oil strike in the U.S.
was discovered underneath Prudhoe Bay. — Construction of the Trans-Alaskan Pipeline began J — The first oil left Prudhoe Bay through the mile pipeline in. Throughput, average per daybbl. 1, bbl. 1, bbl. 1, bbl. 1, bbl. 1, bbl.
Leak is latest of Alaska's pipeline woes Some spills a year occur in the Prudhoe Bay oil fields and along the mile, three-decade-old pipeline system. August 9.